INVESTMENT CONFERENCE

Date: August 30

Location: Hemisphere A & B

The government's "New Revival Policy" projects and private SME investment projects

Investments

198.2 km road Choibalsn to Bayankhosuu border port

Industry:

Start Date:

June 2, 2024

General Info:

The 198.2 km road from Choibalsan to Bayankhoshuu border crossing will pass through the territory of Kherlen, Matad and Khalkh gol soums of Dornod aimag and reach Tamsag 21st field, where PetroChina Daqing Tamsag LLC is extracting oil.

Closing Date:

Transport, Auto Road

September 4, 2028

₮ 190 BILLION

Budget

"Chinggis Khaan" International airport capacity building project

Industry:

Start Date:

April 14, 2028

General Info:

New Ulaanbaatar International Airport LLC, a Mongolian-Japanese joint venture, was established on July 1, 2019 and signed a concession agreement with the Government of Mongolia on July 5, 2019 to implement the Ulaanbaatar New International Airport Management Project. The project will expand the airport's operations and increase its capacity.

Closing Date:

Transport, Airport Terminal

March 31, 2032

₮ 100 BILLION

Budget

Transportation and logistics center in Khushgiin Khundii

Industry:

Start Date:

September 30, 2021

General Info:

The Khushig Valley Transportation and Logistics Center is planned in two versions. Option 1, it will initially cover 340 hectares and will be expanded to 1,589 hectares. Under Option 2, it will initially operate on 276 hectares of land and plans to expand to 800 hectares. The logistics center is planned to have a customs container area with a railway, a closed customs warehouse with a railway, a cold and heat warehouse, a shed area, a container area, and an open and unloading area.

Closing Date:

Transport, Airport Terminal

October 31, 2025

₮ 170 BILLION

Budget

Uvs airport to 4C category

Industry:

Start Date:

April 14, 2024

General Info:

Current capacity: Deglii Tsagaan Airport was commissioned in 2011. The air traffic control tower has an area of 41m2, the capacity of the building is 100 passengers per hour, and there are 60 parking spaces.

Closing Date:

Transport, Airport

March 31, 2028

₮ 70.60 BILLION

Budget

Umnugobi airport to 4C category

Industry:

Start Date:

April 14, 2023

General Info:

Aerodrome:
● The runway has a 2200x30m asphalt concrete surface and a load capacity of: PCN 27/F/B/Y/U.
● With lighting system.
● One sidewalk and 25 meters wide asphalt concrete surface. Capacity: PCN 27/F/B/Y/U.
● Category IV fire extinguishers.
Construction:
● The passenger service complex has an area of 550 m2 to serve 50 passengers per hour,
● Land service building 569 m2,
● Boiler 67m2.

Closing Date:

Transport, Airport

March 31, 2026

₮ 78.70 BILLION

Budget

Ereentsav Border Port Container Terminal

Industry:

Start Date:

December 31, 2022

General Info:

Closing Date:

Transport, Border Port

December 30, 2025

₮ 35.70 BILLION

Budget

Artssuuri Border Port Container Terminal

Industry:

Start Date:

January 31, 2024

General Info:

The terminal will be built on a total area of 50 hectares and will increase its current processing capacity from 0.3 million tons to 1 million tons. The construction of the loading and unloading terminal will create 150 permanent jobs.

Closing Date:

Transport, Border Port

October 31, 2028

₮ 45.00 BILLION

Budget

Expansion of UB II TPP 100 MW

Industry:

Start Date:

December 31, 2022

General Info:

Closing Date:

Energy, Thermal Power Plant

December 30, 2026

₮ 284.60 BILLION

Budget

“Eg”- Hydro power plant

Industry:

Start Date:

November 25, 2013

General Info:

The construction of the “EG” hydropower plant will create a 5.7 billion m3 fresh water reservoir, protect surface water resources, use them properly, protect against flood risks, save 438.7 thousand tons of coal per year, and reduce air pollution and greenhouse gas emissions by 706 thousand tons. The energy generated by this project will be an efficient adjustment to the integrated energy system and a source capable of overcoming peak loads. It will ensure energy independence and save $ 25-26 million in annual import duties on Russia. Conditions will be created for the development of regional natural tourism, water sports, fishing, intensive agriculture and agricultural production.

Closing Date:

Energy, Hydropower

September 29, 2029

₮ 2,482.95 BILLION

Budget

"Buuruljuut" TPP

Industry:

Start Date:

June 29, 2022

General Info:

Tsetsens Mining and Energy LLC is working to build a 300 MW power plant based on the Booroljuut coal mine in the Bagakhangai district as part of a public-private partnership. The first phase of the project will include the construction of a 300 MW (2x150 MW) power plant, a coal mine with a capacity of more than 3 million tons per year, and the construction of a 71 km 220 kV transmission line with a total investment of approximately $632 million.

Closing Date:

Energy, Thermal Power Plant

August 31, 2025

₮ 1,680.00 BILLION

Budget

Baganuur-Chinggis-Choibalsan 220 kV two-circuit OHL with length of 518 km, construction and expansion of new 220 kV substation

Industry:

Start Date:

January 31, 2022

General Info:

The power system in the Eastern Region, to which this line belongs, operates separately from the Central Power System, and the existing 255 MW OHLs 209 and 210 were first commissioned in 1978. The load on this line increases by 80-90 MW during heavy winter loads, and the expected consumption is 222-286 MW.

Closing Date:

Energy, Power Transmission Line

December 30, 2027

₮ 380.00 BILLION

Budget

Expansion of Baganuur-Choir 220 kV single circuit 188 km OHL and substations

Industry:

Start Date:

January 31, 2022

General Info:

The project will ensure the quality, reliability, safety and stability of electricity in Dornogovi, Dundgovi, Khentii, Umnugovi and Sukhbaatar aimags, as well as increase the capacity of the line and meet the growing regional energy needs.

Closing Date:

Energy, Power Transmission Line

December 30, 2027

₮ 90.00 BILLION

Budget